References
KIA MOTORS SLOVAKIA
- Painting:
- on concrete surfaces = 45 000 m2
- Drywall surfaces of = 28.000m2
- Against the dusty floor coating = 12 000 m2
- Renderings of = 15 000 m2
- Of gypsum plaster = 8 800 m2
- Paint door frames = 223 pc
- Coating of synthetic = 340 m2
- Masonry work:
- Of Masonry YTONG = 450 m2
- The plaster = 450 m2
- Reticulate = 450 m2
MOBIS SLOVAKIA
- Painting:
- the concrete surface = 7 000 m2
- on drywall surfaces = 13 .000 m2
- dust proof floor coating = 2 000 m2
- Renderings of = 3 500 m2
- of gypsum plaster = 2 800 m2
- The paint on the frame = 90 pc
- Coating of synthetic = 2 410 m2
- of polyurethane coatings = 1 .850 m2
HYSCO - SLOVAKIA
- Painting:
- Concrete surfaces = 1,900 m2
- drywall surfaces 2 = .400 m2
- Plasters = 500 m2
- gypsum plaster = 600 m2
- Coating synthetic = 210 m2
MULTIFUNCTION HOUSE – ŠAĽA
- Demolition = 2,520 m3
- Formwork and concreting of the base plate = 374 m3
- Structural steel exchanges skylights and doors = 15 400 kg
FAURECIA - HLOHOVEC
- Laying holorib = 4 940 m2
- Sheathing "C" cartridge = 6,500 m2
- Structural steel exchanges (skylights, doors, columns, ...) = 48 000 kg
SHOPPING MALL IKEA BRATISLAVA
- Concreting = 284 m2
- balancing iron = 7 850 kg
ZIPP LOZORNO
- Installation of road curbs = 1.800 bm
- Laying garden curbs = 700 lm
- Pavement + Pavement parking = 600 m2